stone All American 6003 Posts user info edit post |
I am looking to pay someone to write a parametric program for me. I need one for my business for estimating the cost on a project. I am have 9 items that go into this project and they are the same 9 that will always go in. The quantities will change based on the dimension. If anyone can do such a thing pm me and we can discuss this further. 9/2/2011 9:15:36 AM |
A Tanzarian drip drip boom 10995 Posts user info edit post |
Do you need a program for cost-estimation, or do you need someone to program a CNC machine? 9/2/2011 9:31:39 AM |
Stimwalt All American 15292 Posts user info edit post |
We will need a detailed list of requirements, and any changes to the original contract will be out of scope, and out of pocket. <3 Dev 9/2/2011 9:36:27 AM |
Talage All American 5092 Posts user info edit post |
I will write you an excel spreadsheet for $1000 US. 9/2/2011 3:32:35 PM |
stone All American 6003 Posts user info edit post |
it is for cost estimation. i am not gonna lie 1000 bucks is pretty high. i will sit down and do it for that. 9/2/2011 4:20:37 PM |
A Tanzarian drip drip boom 10995 Posts user info edit post |
Talage pretty much said what we're all thinking. Why don't you just put together a spreadsheet? 9/2/2011 4:26:12 PM |
stone All American 6003 Posts user info edit post |
time, it will take me 2 or 3 days to do it. i am not an exel wizard. i am a run a company wizard who hires people smarter than me to do things i am not good at. if i lost 2 days trying to make an excel sheet that i am not certain will work at the end then that is a large risk of my time.
here at the basic perimeters, if some one can make it work i will pay for it.
1. we build light boxes for large companies like nike, belk, famous footware, the gap, and many more large retailers. every day i have to quote a new size light box. each size box cost different based on the size due to the number of led's, power supplies, footage of frame, sqft of graphics, size of backer board, and the lengths the parts come in. i also have to change cost of the items due to duties, dollar value vs euro and shipping costs. 2. i do not want to just use a square foot price because i need to know qty of components for inventory levels because it takes 6 weeks to get the aluminum and led's from china. 3. the market is very competitive so 50 bucks on a 3000 dollar light box is a lot when they order them in the 100's based on the number of locations the store has.
yes a multi page spread sheet will work but i do not know how to put values on an item when one size box will take 200 leds and another will take 1000 based on size. and i do not know how to move from one page to the other in my formulas. and i do not have days to f-around with it should my attempt not work. 9/2/2011 10:10:31 PM |
moron All American 34142 Posts user info edit post |
check your PMs 9/2/2011 10:22:38 PM |
stone All American 6003 Posts user info edit post |
thanks for all the pm's guys. i have someone working on it now. if it looks like it wont work i will contact next in line who is moron. 9/3/2011 9:16:15 AM |
krs3g All American 1499 Posts user info edit post |
I was gonna say dude, $1000 bones? Throw this on Scriptlance and have it knocked out for $50 or less. 9/7/2011 3:59:38 PM |